    A team of engineers is working on a project for commercial space flight. Looks like things are moving right along. Here's a photo from their progress




    Objectives:
    The third powered flight of SpaceShipOne. 55 seconds motor burn time. Handling qualities during boost and performance verification. Reaction control system use for reorientation to entry attitude. Supersonic feather stability and control.

    Results:
    Launch conditions were 46,000 feet and 120 knots. Motor light off occurred 10 seconds after release and the vehicle boosted smoothly to 150,000 feet and Mach 2.5. Subsequent coast to apogee of 211,400 feet. During a portion of the boost, the flight director display was inoperative, however the pilot continued the planned trajectory referencing the external horizon. Reaction control authority was as predicted and the vehicle recovered in feather experiencing 1.9M and 3.5G’s. Feather oscillations were actively damped by the pilot and the wing was de-feathered starting at 55,000 feet. The onboard avionics was re-booted and a smooth and uneventful landing made to Mojave.
    Last edited by [AK?]Clay; 05-14-2004 at 10:54 PM.

Similar Threads

  1. Project IGI
    By [AK]Palooka in forum August Knights Round Table
    Replies: 4
    Last Post: 12-05-2000, 12:39 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •